| author | Vrishali Doke | 2012-09-03 04:42:31 (EDT) |
|---|---|---|
| committer | Stephan Born | 2012-09-03 04:42:31 (EDT) |
| commit | d367659a94b4d26846a317ccaab65adcb025a570 (patch) (side-by-side diff) | |
| tree | 2124960932bcf4419d87d058a22d2e5f14bb2627 | |
| parent | c859ebe9ed38b6f7191357e4ed4569771e521226 (diff) | |
| download | org.eclipse.stardust.documentation-d367659a94b4d26846a317ccaab65adcb025a570.zip org.eclipse.stardust.documentation-d367659a94b4d26846a317ccaab65adcb025a570.tar.gz org.eclipse.stardust.documentation-d367659a94b4d26846a317ccaab65adcb025a570.tar.bz2 | |
CRNT-25977 - Added Activities chapter
git-svn-id: http://emeafrazerg/svn/ipp/product/trunk/stardust/documentation@58859 8100b5e0-4d52-466c-ae9c-bdeccbdeaf6b
16 files changed, 154 insertions, 237 deletions
diff --git a/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/images/act-fly-connect.png b/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/images/act-fly-connect.png Binary files differnew file mode 100644 index 0000000..9f15bbb --- a/dev/null +++ b/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/images/act-fly-connect.png diff --git a/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/images/act-fly-del.png b/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/images/act-fly-del.png Binary files differnew file mode 100644 index 0000000..cc65956 --- a/dev/null +++ b/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/images/act-fly-del.png diff --git a/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/images/act-fly-event.png b/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/images/act-fly-event.png Binary files differnew file mode 100644 index 0000000..4e79dd7 --- a/dev/null +++ b/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/images/act-fly-event.png diff --git a/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/images/act-fly-gateway.png b/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/images/act-fly-gateway.png Binary files differnew file mode 100644 index 0000000..47d1fbf --- a/dev/null +++ b/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/images/act-fly-gateway.png diff --git a/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/images/act-fly-man.png b/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/images/act-fly-man.png Binary files differnew file mode 100644 index 0000000..0f83adc --- a/dev/null +++ b/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/images/act-fly-man.png diff --git a/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/images/act-fly-menu.png b/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/images/act-fly-menu.png Binary files differnew file mode 100644 index 0000000..08cbef4 --- a/dev/null +++ b/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/images/act-fly-menu.png diff --git a/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/images/act-fly-newact.png b/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/images/act-fly-newact.png Binary files differnew file mode 100644 index 0000000..bcc7d91 --- a/dev/null +++ b/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/images/act-fly-newact.png diff --git a/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/images/act-fly-sub.png b/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/images/act-fly-sub.png Binary files differnew file mode 100644 index 0000000..b3fc418 --- a/dev/null +++ b/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/images/act-fly-sub.png diff --git a/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/images/act-gen-app.png b/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/images/act-gen-app.png Binary files differnew file mode 100644 index 0000000..b72ac0c --- a/dev/null +++ b/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/images/act-gen-app.png diff --git a/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/images/act-gen-prop.png b/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/images/act-gen-prop.png Binary files differnew file mode 100644 index 0000000..6b693fc --- a/dev/null +++ b/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/images/act-gen-prop.png diff --git a/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/images/app-act.png b/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/images/app-act.png Binary files differnew file mode 100644 index 0000000..0797bfd --- a/dev/null +++ b/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/images/app-act.png diff --git a/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/images/manual-act.png b/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/images/manual-act.png Binary files differnew file mode 100644 index 0000000..18ceb66 --- a/dev/null +++ b/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/images/manual-act.png diff --git a/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/images/subpro-act.png b/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/images/subpro-act.png Binary files differnew file mode 100644 index 0000000..1223adf --- a/dev/null +++ b/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/images/subpro-act.png diff --git a/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/pep-activities.htm b/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/pep-activities.htm index 5b9dba4..ac239c1 100644 --- a/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/pep-activities.htm +++ b/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/pep-activities.htm @@ -20,17 +20,33 @@ </script> <h1>Specifying Activities</h1> +<p>When you create a new activity in the @productname@'s Business Process Modeling perspective, +by default, it creates a manual activity. You can create following type of activities in Business + Process Modeling perspective.</p> + <ul> + <li>Manual Activity - This <img src="images/manual-act.png"> icon represents the manual activity. </li> + <li>Application Activity - This <img src="images/subpro-act.png"> icon represents the application activity.</li> + <li>Subprocess Activity - This <img src="images/app-act.png"> icon represents the subprocess activity.</li> + + </ul> + <p>For more information, please refer to the chapter <a href="PLUGINS_ROOT/org.eclipse.stardust.docs.dev/ + html/handbooks/concepts/workflow-basics/mg-basics-5.htm">Activities</a> + of the <a href="PLUGINS_ROOT/org.eclipse.stardust.docs.dev/ + html/handbooks/concepts/key-concepts.html">Concepts handbook</a>.</p> + +<p>You can perform following operations on activities:</p> <ul> <li><a href="#add">Adding Activities</a></li> + <li><a href="#renam">Renaming Activities</a></li> <li><a href="#del">Deleting Activities</a></li> - <li><a href="#fly">Activity Flyout Menu</a></li> + <li><a href="#fly">Using Activity Flyout Menu</a></li> <li><a href="#mod">Viewing and Modifying Activity Properties</a></li> </ul> <h2 id="add">Adding Activities</h2> <p> -To add activities, you can either: +You can add activity using four different ways: </p> <ul> <li>In the toolbar, click <strong>Create Activity</strong> icon and drop it to swim lanes</li> @@ -49,6 +65,36 @@ To add activities, you can either: </ul> +<p>OR</p> +<ul> + + <li>Drag an application from the <strong>Applications</strong> node in the <strong>My Process Models</strong> panel + and drop it in the swim lane. + The application activity gets created.</li> +</ul> + +<p>OR</p> +<ul> + <li>Drag a process definition from the model node in the <strong>My Process Models</strong> panel + and drop it in the swim lane. + The subprocess activity gets created.</li> +</ul> + + + + + +<p>By default, manual activity gets created.</p> +<h2 id="renam">Renaming Activities</h2> + +<p>To rename activities, perform the following steps:</p> + +<ol> + <li>Double-click activity name in the swim lanes</li> + <li>Specify the new name</li> + +</ol> + <h2 id="del">Deleting Activities</h2> <p>To delete activities, perform the following steps:</p> @@ -60,249 +106,119 @@ To add activities, you can either: <p class="image"><img src="images/del-act.png" alt=""> <br> <strong>Figure:</strong> Delete Activity - Flyout Menu</p> - </ol> - - - -<!-- -<p>As explained in the chapter <a href="mg-basics-5.htm">Activities</a> a series of -activities connected with one another by transitions constitutes the core of the process. +<h2 id="fly">Using Activity Flyout Menu</h2> +<p>The activity flyout menu is displayed when you hover the mouse in the proximity of the activity. </p> -<p>An activity is represented in the <strong>Process Workbench</strong> in two -different ways. In the <strong>Outline</strong> view it is represented by a small gear -pictogram. In diagrams you will see an activity depicted as a box possibly with transition -symbols.</p> -<p> </p> -<p class="image"><img src="images/mg-defdesk-17.png" alt=""> <br> -<strong>Figure:</strong> A Representation of an Activity</p> -<h2>Creating and Deleting Activities</h2> -<p>To create an activity you can either:</p> -<ul> - <li>In the diagram toolbar palette select <strong>Activites</strong> under <strong>Items</strong> - and click on the canvas to place the activity symbol there. The created activity will - also appear in the tree view under the process definition symbol in the <strong>Outline</strong> - view.</li> -</ul> -<p class="image"><img src="images/mg-create-activity.png" alt=""> <br> -<strong>Figure:</strong> Creation of an Activity</p> -<ul> - <li>In the <strong>Outline</strong> view select the process definition to which - you want to add an activity. From its pop-up menu choose <strong>New Activity</strong>. - The created activity will appear in the tree view under the process definition symbol. - Subsequently, you can drag the activity symbol to the diagram canvas to create an - activity symbol there.</li> -</ul> -<p>When deleting activities you must make a distinction between deleting an activity -from the model information or only deleting a symbol from a diagram. To do the first - -delete an activity from model - you proceed as follows:</p> -<ul> - <li>Having selected the symbol of the activity in the <strong>Outline</strong> - view, choose the option <strong>Delete </strong> in the pop-up menu of this process - definition.</li> - <li>Having selected the symbol of the activity in a process definition diagram, - choose the option <strong>Delete</strong> in the pop-up menu of this activity.</li> -</ul> -<p>The option <strong>Delete Symbol </strong> in the pop-up menu called from within -the diagram canvas will only remove the activity symbol from the diagram.</p> -<h2>Modifying Activity Properties</h2> -<p>The properties of an activity are accessible in its properties dialog. To open -this dialog, right-click the activity symbol - in the <strong>Outline</strong> view or -diagram - and select the option <strong>Properties</strong>. Double-clicking on the -activity symbol will open this dialog as well.</p> -<p>Activity characteristics are bundled into the following categories, each -represented in an own tabbed pane:</p> -<ul> - <li><a href="#general">General</a></li> - <li><a href="#display">Display</a></li> - <li><a href="#controlFlow">Control Flow</a></li> - <li><a href="#in">In Data Mappings</a></li> - <li><a href="#out">Out Data Mappings</a></li> - <li><a href="#controlling">Controlling</a></li> - <li><a href="#simulation">Simulation</a></li> - <li><a href="#effort">Effort Planning</a></li> -</ul> -<h3 id="general">General</h3> -<p>Next to a name, an ID and a description, general properties of an activity -comprise the following checkbox options:</p> -<ul> - <li><strong>Auto Id Generation</strong><br><br> - Overwrites the option for automatic Id generation set in <a - href="mg-preferences.html">@productname@ Preferences</a>.<br><br></li> - <li><strong>Allows Abort by Participant</strong><br><br> - Determines whether the assigned participant may abort instances of this - activity in the @productname@ Portal.<br> - Note that only the activity itself is aborted, not the root process hierarchy. - The process instances will continue as if this activity had been completed.<br> - This option affects the Process Portal activity operations only. It does not - influence the @productname@ API usage.<br><br></li> - <li><strong>Hibernate Initially</strong> (Hibernate On Creation)<br><br> - Determines whether the activity instance should directly change its state to - hibernated after creation - thus ending the synchronous flow here.<br><br></li> - <li><strong>Supports relocation</strong><br><br> - Determines if relocation is supported for this activity and it can - be used as starting point for the relocation. This checkbox is enabled for - manual activities and application activities only. For - details on relocation, refer to chapter - <a href="PLUGINS_ROOT/org.eclipse.stardust.docs.dev/html/handbooks/concepts/executing-workflow/concept-relocation.html">Relocation of Activities</a> - in the <a href="PLUGINS_ROOT/org.eclipse.stardust.docs.dev/html/handbooks/concepts/key-concepts.html">Concepts</a> - section of the - <a href="PLUGINS_ROOT/org.eclipse.stardust.docs.dev/html/handbooks/handbooks.htm"> - Developer Handbooks</a>.<br><br></li> - <li><strong>Is relocation target</strong><br><br>Determines if the activity - is allowed as target point of a relocation. For - details on relocation, refer to chapter - <a href="PLUGINS_ROOT/org.eclipse.stardust.docs.dev/html/handbooks/concepts/executing-workflow/concept-relocation.html">Relocation of Activities</a> - in the <a href="PLUGINS_ROOT/org.eclipse.stardust.docs.dev/html/handbooks/concepts/key-concepts.html">Concepts</a> - section of the - <a href="PLUGINS_ROOT/org.eclipse.stardust.docs.dev/html/handbooks/handbooks.htm"> - Developer Handbooks</a>.</li> -</ul> -<p class="image"><img src="images/mg-defdesk-18.png" alt="General Activity Properties"> -<br> -<strong>Figure:</strong> General Activity Properties</p> -<p>Please note that IDs containing - hyphens, blanks or dots and IDs starting with digits are not supported.</p> -<h3 id="display">Display</h3> -<p>For this property a checkbox is provided to mark activities as auxiliary -from a business perspective. This option is disabled by default, except for the route activities. -Auxiliary activities marked as <strong>Is Auxiliary Activity</strong> -will be treated equivalent to route activities in the process history.</p> -<p class="image"><img src="images/activity-props-display.png" - alt="Display Option"> <br> -<strong>Figure:</strong> Is Auxiliary Activity Option</p> -<p>For route activities, this option -is set to <strong>Is Auxiliary Activity</strong> per default.</p> -<h3 id="controlFlow">Control Flow</h3> -<p>Control flow options define the split, join and loop behavior around the -activity.</p> -<p class="image"><img src="images/mg-defdesk-19.png" alt="Control Flow Options"> -<br> -<strong>Figure:</strong> Control Flow Options</p> -<p><strong>Join</strong> behavior specifies the runtime behavior in case of multiple transitions from -the predecessor activity leading to the chosen activity. The following options are -offered:</p> -<ul> - <li>All incoming transitions are required to be processed for the execution of - the activity (join with the <strong>AND</strong> option).</li> - <li>If one incoming transition is processed the chosen activity is instantiated - (join with the<strong> XOR</strong> option). If multiple incoming transitions are - processed at runtime the chosen activity is instantiated multiple times.</li> -</ul> -<p><strong>Split</strong> behavior specifies how multiple transitions to the following activities are -to be executed:</p> -<ul> - <li>all (split with the <strong>AND</strong> option)</li> - <li>or one of them (split with <strong>XOR</strong> option).</li> -</ul> -<p>See also <a href="mg-basics-6.htm">Control Flow</a> for basic informations.</p> + <p class="image"><img src="images/act-fly-menu.png" alt=""> <br> +<strong>Figure:</strong> Activity - Flyout Menu</p> +<p>Following menu options are available in the activity flyout menu.</p> + +<table> + <tr> + <th>Menu Icon</th> + <th>Menu Option</th> + <th>Description</th> + </tr> + <tr> + <td><img src="images/act-fly-del.png" alt=""></td> + <td>Delete</td> + <td>Deletes the activity.</td> + </tr> + <tr> + <td><img src="images/act-fly-man.png" alt=""></td> + <td>Subprocess</td> + <td>Changes the activity type to subprocess. Click the Subprocess icon to change the activity type to Subprocess.</td> + </tr> + <tr> + <td><img src="images/act-fly-sub.png" alt=""> + </td> + <td>Application</td> + <td>Changes the activity type to application. Click the Application icon to change the activity type to Application.</td> + </tr> + <tr> + <td><img src="images/act-fly-connect.png" alt=""> + </td> + <td>Sequence Flow</td> + <td>Starts a connection from the activity. Click the Sequence Flow icon and connect it to another activity.</td> + </tr> + <tr> + <td> + <img src="images/act-fly-newact.png" alt=""></td> + <td>New Activity</td> + <td>Adds a new manual activity connected from the existing activity. Click the new activity icon and drop it on the swim lane.</td> + </tr> + <tr> + <td> + <img src="images/act-fly-gateway.png" alt=""> + </td> + <td>New Gateway</td> + <td>Adds a new gateway connection to the activity. Click the new gateway connection and drop it between the activities.</td> + </tr> + <tr> + <td><img src="images/act-fly-event.png" alt=""> + </td> + <td>New End Event</td> + <td>Adds a new end event to the activity. Click the new end event icon and drop it on the swim lane.</td> + </tr> + +</table> -<p><strong>Loop </strong>behavior specifies how an activity is repeated -until the loop condition is fulfilled. During the runtime execution of loop activity -the specific part of the workflow is repeated. -<p> When an activity enters the loop, one or more instances of the activity are created and performed. -On termination of the activity instance, the loop condition is evaluated and based on the result - a new activity instance is created. This is repeated until the loop gets terminated and then -the subsequent activity is performed, if any.</p> -<p> None indicates that the activity is performed exactly once regardless of the evaluation of the condition. -The following loop conditions can be applied when the activity needs to be performed more than once. </p> +<h2 id="mod">Viewing and Modifying Properties of an Activity</h2> +<h3>General Properties</h3> -<ul> - <li> While - indicates that the condition is evaluated before the creation of an activity - instance. If the condition evaluation result is TRUE, an activity instance is created and performed. - If FALSE, the workflow continues and the next activity is performed. Using "while" loop it - is possible that no activity instance is created.</li> - <li> Repeat - indicates that the condition is evaluated at the completion of the activity instance. - If the condition evaluation result is TRUE, the loop ends and the next activity is performed. - If FALSE, a new instance of the activity is created and repeated.</li> +<p>To view and modify the properties of an activity, perform the following steps:</p> +<ol> + <li>Select the activity in the swim lane. + The properties window is displayed at the top right corner of the swim lane. </li> +<p class="image"><img src="images/act-gen-prop.png" alt=""> <br> +<strong>Figure:</strong> Activity - General Properties</p> + + <li>Specify the properties: + <ul> + <li>UUID - A unique identifier ID gets generated as an identifier for client server communication</li> + <li>ID - Default ID of the activity</li> + <li>Name - Specify name of the activity</li> + <li>Description - Specify the description</li> + <li>Allow Abort by Participant - Determines whether the assigned participant may abort instances of + this activity in the Infinity Process Platform Portal. + Note that only the activity itself is aborted, not the root process hierarchy. + The process instances will continue as if this activity had been completed. + This option affects the Process Portal activity operations only. + It does not influence the Infinity Process Platform API usage. + <li>Hibernate Initially (Hibernate On Creation) - + Determines whether the activity instance should directly change its state to + hibernated after creation - thus ending the synchronous flow here.</li> + <li>Supports relocation -Determines if relocation is supported for this + activity and it can be used as starting point for the relocation. + This check box is enabled for manual activities and application activities only.</li> + <li>Is relocation target -Determines if the activity is allowed as + target point of a relocation. For details on relocation, + refer to chapter <a href=""> Relocation of Activities</a> in the Concepts section of the Developer Handbooks. + </li> + <li>Application - By default, this option is selected. When you select this option, the activity icon + changes to application icon. + The adjacent drop-down list displays list of applications + defined in all the models displayed under the <strong>Models</strong> node.</li> + <p class="image"><img src="images/act-gen-app.png" alt=""> <br> +<strong>Figure:</strong> Activity - General Properties - Application</p> + <li>Suprocess - If you select the option, the activity acts as a subprocess and + the activity icon + changes to subprocess icon with a plus sign in the center-bottom of the activity. + The adjacent drop-down list displays all the processes defined in all the models + displayed under the <strong>Models</strong> node. + <ul> + <li>Share Data with Current Process - TO DO. Clarification from Marc and Kyle. Told Caroline to + ask them.</li> + </ul> </ul> -<p> The syntax language for the loop condition parameter is carnotEL. Currently, the single line format -is supported. The following figure explains the While loop condition.</p> -<p> </p> -<p class ="image"><img src = "images/while-loop.png" alt=""> -<br> -<strong>Figure:</strong>While Loop Condition</p> - -<p> More elaborate cycles in the model should be modeled -explicitly by cycles in the activity/transition graph. See figure below.</p> -<p class="image"><a href="images/mg-defdesk-trans-cycle_orgSize.png" target="_blank"> -<img src="images/mg-defdesk-trans-cycle.png" alt=""></a> <br> -<strong>Figure:</strong> Transition in a Cycle</p> -<p>In this example transition conditions influence the process flow. Please refer to -<a href="mg-defdesk-5.htm#transitionConditions">Specifying Transition Conditions</a>.</p> -<h3 id="in">In Data Mappings</h3> -<p>The activity properties dialog allows you to add and remove data mappings -belonging to this activity. The In data mapping maps workflow data to the input of the -activity. Refer to <a href="mg-defdesk-7.htm">Specifying Data</a> for more information on -mapping data to applications via an activity.</p> - -<h3 id="out">Out Data Mappings</h3> -<p>The activity properties dialog allows you to add and remove data mappings -belonging to this activity. The Out data mapping maps workflow data to the output of the -activity. Refer to <a href="mg-defdesk-7.htm">Specifying Data</a> for more information on -mapping data to applications via an activity.</p> +</ol> -<h3 id="controlling">Controlling Properties</h3> -<p>The @productname@ Analyst Edition provides activities with the following controlling -properties:</p> -<ul> - <li>Measure</li> - <li>Target Measure Quantity</li> - <li>Difficulty</li> - <li>Target Processing Time</li> - <li>Target Execution Time</li> - <li>Target Idle Time</li> - <li>Target Waiting Time</li> - <li>Target Queue Depth</li> - <li>Target Cost Per Execution</li> - <li>Target Cost Per Second</li> - <li>Resource Performance Calculation</li> -</ul> -<br /> -<p class="image"><img src="images/mg-act-controlling.png" alt=""> <br> -<strong>Figure:</strong> Controlling Properties</p> -<h4 id="resource">Resource Performance Calculation</h4> -<p>This property has the default -value <tt>include</tt> for interactive activities and <tt>not include</tt> for -non-interactive activities. It is used in the Business Control Center view -<a href="PLUGINS_ROOT/org.eclipse.stardust.docs.enduser/html/handbooks/execution-clients/bcc_renovated/views/bcc-views-resource.html"> -Resource Performance</a> view, -where all activities having this controlling property set to <tt>include</tt> are -included into the calculation.</p> -<h3 id="simulation">Simulation</h3> -<p>In this section you can specify simulation configurations, as described detailed in -the chapter <a - href="PLUGINS_ROOT/org.eclipse.stardust.docs.simulation/html/simulation/simulation-configurations.html"> -Simulation Configurations</a> of the <a - href="PLUGINS_ROOT/org.eclipse.stardust.docs.simulation/html/simulation/toc.html"> -Developer Simulation Guide</a>.)</p> -<h3 id="effort">Effort Planning</h3> -<p>In this section you can specify the subprocess refinement required.</p> -<p class="image"><img src="images/activitiy-prop-effort.png" - alt="Effort Planning Prop"> <br> -<strong>Figure:</strong> Setting the Subprocess Refinement Required.</p> -<p>Pease refer to the chapter <a href="process-effort-calculation.html">Project -Effort Calculation</a> for detailed information on Project Effort calculations.</p> -<h2 id="subprocess">Subprocess Activities</h2> -<p>To define an activity as a subprocess:</p> -<ul> - <li>Right-click the symbol in the diagram canvas and choose <strong>Subprocess</strong>.</li> - <li>Select the process you want to define as subprocess.</li> -</ul> -<p class="image"><img src="images/mg-select-subprocess.png" - alt="Setting the Implementation to Subprocess"> <br> -<strong>Figure:</strong> Setting the Implementation to Subprocess</p> -<p>For details on configuring subprocess activities, refer to chapter -<a href="PLUGINS_ROOT/org.eclipse.stardust.docs.dev/html/handbooks/modelling/mg-subprocesses.html"> -Configuring Subprocess Activities</a> -of the -<a href="PLUGINS_ROOT/org.eclipse.stardust.docs.dev/html/handbooks/handbooks.htm"> -Developer Handbooks</a>.</p> --> <script language="JavaScript" type="text/javascript"> <!-- writeFooter(); diff --git a/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/pep-pools-lanes.htm b/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/pep-pools-lanes.htm index db5af56..4aaea8d 100644 --- a/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/pep-pools-lanes.htm +++ b/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/pep-pools-lanes.htm @@ -155,7 +155,8 @@ Also, when you hover the mouser over the symbol its outline changes to red color alt="Mouse Hover - Flyout Menu" /> <br> <strong>Figure:</strong> Mouse Hover - Flyout Menu</p> <h4>Double-clicking Symbol</h4> -<p>To rename the activity or subprocess activity and application, double-click on its symbol name in the swim lane. +<p>To rename the activity or subprocess activity and application, double-click on its +symbol name in the swim lane and specify new name. </p> <p class="image"><img src="images/doubl-clik.png" alt="Double-click on Activity Symbol" /> <br> diff --git a/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/pep-process.htm b/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/pep-process.htm index eaa2504..ac76e70 100644 --- a/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/pep-process.htm +++ b/org.eclipse.stardust.docs.analyst/html/handbooks/modelling_analyst/pep-process.htm @@ -75,7 +75,7 @@ A typical process definition contains swim lanes, activities and gateways, appli <h2 id="prop">Modifying Properties of a Process Definition</h2> <h3>General Properties</h3> -<p>To view the properties of a process definition, perform the following steps:</p> +<p>To view and modify the properties of a process definition, perform the following steps:</p> <ol> <li>Select the process definition under the model node. The properties window is displayed at the top right corner @@ -166,7 +166,7 @@ A typical process definition contains swim lanes, activities and gateways, appli </ol> <p>For more information, please refer to the chapter -<a href="PLUGINS_ROOT/org-eclipse.stardust.docs.dev/html/handbooks/modelling/mg-defdesk-3.htm">Working with Process Definition</a> +<a href="PLUGINS_ROOT/org.eclipse.stardust.docs.dev/html/handbooks/modelling/mg-defdesk-3.htm">Working with Process Definition</a> |

