Skip to main content
summaryrefslogtreecommitdiffstats
diff options
context:
space:
mode:
authorRyan D. Brooks2011-04-22 16:29:48 -0400
committerRyan D. Brooks2011-04-22 16:29:48 -0400
commit38b1ff989eadb3229fd4c0421102e7a60a4c1554 (patch)
tree4b470b77fcecf4744ae2eb8c623b7c146a4fe22d /plugins/org.eclipse.osee.support.admin/eclipseCon/2008/The Cure for Your Disconnected Toolset Headache/.svn/text-base/agenda.txt.svn-base
parent87a439a142dad13c554519329ebec4da3b406f42 (diff)
downloadorg.eclipse.osee-38b1ff989eadb3229fd4c0421102e7a60a4c1554.tar.gz
org.eclipse.osee-38b1ff989eadb3229fd4c0421102e7a60a4c1554.tar.xz
org.eclipse.osee-38b1ff989eadb3229fd4c0421102e7a60a4c1554.zip
refactor: Introduce end-of-line normalization
Diffstat (limited to 'plugins/org.eclipse.osee.support.admin/eclipseCon/2008/The Cure for Your Disconnected Toolset Headache/.svn/text-base/agenda.txt.svn-base')
-rw-r--r--plugins/org.eclipse.osee.support.admin/eclipseCon/2008/The Cure for Your Disconnected Toolset Headache/.svn/text-base/agenda.txt.svn-base38
1 files changed, 19 insertions, 19 deletions
diff --git a/plugins/org.eclipse.osee.support.admin/eclipseCon/2008/The Cure for Your Disconnected Toolset Headache/.svn/text-base/agenda.txt.svn-base b/plugins/org.eclipse.osee.support.admin/eclipseCon/2008/The Cure for Your Disconnected Toolset Headache/.svn/text-base/agenda.txt.svn-base
index ac7c17792a..3b743e2de6 100644
--- a/plugins/org.eclipse.osee.support.admin/eclipseCon/2008/The Cure for Your Disconnected Toolset Headache/.svn/text-base/agenda.txt.svn-base
+++ b/plugins/org.eclipse.osee.support.admin/eclipseCon/2008/The Cure for Your Disconnected Toolset Headache/.svn/text-base/agenda.txt.svn-base
@@ -1,20 +1,20 @@
-title slide
-
-
-traceability
-tight integration (around the data)
-baselining / product lines / variant control
-V diagram
-systems engineering
-arhcitecture diagram
-collaboration
-
-
-show credability - include screen shots and demo
-zest viewer
-
-worklfow/ process integration
-maturity / status
-future plans
-lean
+title slide
+
+
+traceability
+tight integration (around the data)
+baselining / product lines / variant control
+V diagram
+systems engineering
+arhcitecture diagram
+collaboration
+
+
+show credability - include screen shots and demo
+zest viewer
+
+worklfow/ process integration
+maturity / status
+future plans
+lean
beyond vertical \ No newline at end of file

Back to the top