Task List

Use the Task List to view and manage your tasks. If the task list view is not visible, you can open it by navigating to Window -> Show View -> Other... -> Mylyn -> Task List. The Task List contains both "Local Tasks" and shared "repository tasks" that are stored in a task repository such as Bugzilla or Jira. See how to create new tasks. Local tasks are typically contained in categories, which you can create by right-clicking on the task list and selecting new -> category. Repository tasks are contained in special categories that represent queries.

At the top of the Task List, you will find the following buttons and features:

Task List Presentation

The task list supports several ways to present tasks. You can toggle between the following modes by using the "Task Presentation" button in the toolbar.

In either presentation, you can toggle the "Focus on Workweek" button. In this mode, only the following tasks will be visible:

Icon Legend and Color Coding

See the legend below to interpret the icons and color coding in the task list. You can view this legend by selecting "Show UI Legend" from the menu that appears when you click the white down arrow next to the minimize button in the top right corner of the Task List view.

Scheduling

Two kinds of dates for scheduling are provided.

Scheduled Date

Due Date

Synchronization

Repository tasks and queries are synchronized to reflect the latest changes on the server. Tasks are synchronized the following ways:


Disconnected Mode
A task repository can be put into Disconnected mode via the right-click menu in the Task Repositories view. This can be useful if the task repository is not currently in use (e.g. you are no longer engaged with the project, or the repository is no longer available). The offline support will ensure that you can still access tasks that you have worked with via their offline copies, and the Disconnected mode will ensure that synchronization warnings do not appear. Note that it is not necessary to turn off synchronization or work in Disconnected Mode when working offline.

Incoming Changes

A blue arrow to the left of a task indicates that the task has changed in the shared repository. Double-click the task to view it in the task editor. Changes to the task will be highlighted in blue.

To quickly review the differences since the task was last read, hover over the task in the Task List to view a summary in a tooltip. You can also press F4 to display a tooltip. You may also wish to view the task list in "Focus on Workweek" mode, which will filter out tasks without incoming changes that are not scheduled or due this week. You can toggle "Focus on Workweek" using a button in the Task List's toolbar.

Keyboard Shortcuts

You can use the following hot keys to quickly access frequently used functionality.

F2 rename
F4 show tooltip
F5 synchronize
Alt + Down go to next unread
Alt + Up go to previous unread
Alt + Shift + R mark as read
Alt + Shift + U mark as unread
Esc hide tooltip
Enter open task
Insert new local task
Ctrl+C Copy details
Ctrl+F Find

Reviewing Tasks

The task list has been carefully designed to support quickly reviewing tasks. Task reviewing is best done by configuring a query to show the tasks that you want to review. Once the tasks are displayed in the Task List they can be reviewed one at a time by scrolling through them using the keyboard up/down arrows. The task tooltip should provide enough detail to do a review and will display information relevant to the currently selected task.

To edit the selected task press the enter key, use Ctrl+Enter to open the task in the background. To quickly jump to the next unread task hold down the Alt-key when pressing up or down. To mark a task as read while navigating use Alt+shift+up/down. When reviewing tasks in this way, it is best to avoid mouse-based and gesture-based scrolling.

Task Progress Indicators

Weekly progress
When in Focus on Workweek mode (right-most toolbar button), the Task List will show a progress bar that indicates progress on the tasks scheduled for the current week. Each task that is scheduled for the week but not yet completed adds to the bar. A task completed by you adds to the green progress in the bar. Deferring a task to a future week will also add to the apparent progress because it will remove the task from the current week. Mousing over the bar will indicate details about your progress, such as the number of tasks and hours completed. To avoid the need for manual estimation by default every task is estimated for 1 hour, but if you have longer or shorter running tasks that week you can adjust the estimate in the task editor's Planning page to ensure that the progress bar is accurate.

Note that when in Focus on Workweek mode the Task List will show each of the tasks scheduled for this week. However, overdue tasks and those with incoming changes will also show, making the number of tasks visible not be a reliable indicator of progress on the tasks planned for the week.


Category Progress
You can hover over categories in the task list to display a tooltip that displays a summary of complete and incomplete tasks.

Task List Settings and Operations

Click the small white arrow in the top left of the task list to access the following settings:


Right-clicking in the task list provides access to the following operations